住宅楼临电施工安全方案-secret.doc
zh****db
在线预览结束,喜欢就下载吧,查找使用更方便
相关资料
住宅楼临电施工安全方案-secret.doc
加强现场临时用电管理1工程概况临电工程供电方式采用TN-S系统,即三相五线制接零保护系统,实行三级配电两级保护,地电阻测试值小于4Ω。施工现场总箱中零线做出重复接地后引出一根专用PE线,除了总箱处外,其他各处不得把N线和PE线连接,PE线上不许安装开关和融断器,也不得把大地兼做PE线,PE线也不得进入漏电保护器.电气设备的金属外壳必须与专用保护零线连接。2设置漏电保护器2。1施工现场的总配电箱、分配电箱和开关箱设置三极漏电保护器。且三级漏电保护器的额定漏电动作电流和额定漏电动作时间应作合理配合,使之具有分
湖南某住宅项目临水临电施工方案-secret.doc
目录一、工程概况·····················································11、工程简介················································12、主要机械设备投入情况····································13、主要机械设备布置情况····································1二、编制依据··································
湖南某住宅项目临水临电施工方案-secret.doc
目录一、工程概况·····················································11、工程简介················································12、主要机械设备投入情况····································13、主要机械设备布置情况····································1二、编制依据··································
安全及临电施工组织方案.doc
大庆油田后四厂搬迁项目—大管液体涂料厂房等工程安全文明施工及临时用电施工组织设计--第一章:工程概况一、工程概况:本工程为大庆后四厂防腐管道厂-大管液体涂料厂房等工程(包括:焊接厂房、沥青防腐厂房、大管液体涂料厂房、管件胶带防水帽厂房、抓管车间、大管坡口厂房)2、建设单位:指挥部3、建设地点:大庆经济技术开发区4、建设规模:2678万元5、开、竣工日期:开工2009年5月2日竣工2009年9月30日二、编制说明(1)本工程设计说明(2)国家现行安全施工规范(3)内部文件,管理制度三、国家
某高层住宅楼工程临电施工方案.doc
建筑工程施工临时用电专项方案一、编制依据《低压配电设计规范》GB50054-95中国***出版社《建筑工程施工现场供电安全规范》GB50194-93中国***出版社《通用用电设备配电设计规范》GB50055-93中国***出版社《供配电系统设计规范》GB50052-95中国***出版社《施工现场临时用电安全技术规范》JGJ46-2005中国***出版社二、施工条件1、工程概况XXX家园3、4楼工程位于XXX路路口,属于框剪结构,地上19层,,建筑总高度58.65米,建筑总面积15156平方米,标准层层高3