预览加载中,请您耐心等待几秒...
1/10
2/10
3/10
4/10
5/10
6/10
7/10
8/10
9/10
10/10

亲,该文档总共17页,到这已经超出免费预览范围,如果喜欢就直接下载吧~

如果您无法下载资料,请参考说明:

1、部分资料下载需要金币,请确保您的账户上有足够的金币

2、已购买过的文档,再次下载不重复扣费

3、资料包下载后请先用软件解压,在使用对应软件打开

目录 一、工程概况·····················································1 1、工程简介················································1 2、主要机械设备投入情况····································1 3、主要机械设备布置情况····································1 二、编制依据······················································1 三、现场施工负荷计算············································1 四、变压器容量选择················································1 五、设计配电系统··················································3 1、施工用电材料·············································3 2、施工用电线路布设及实施方法·······························3 3、照明线路·················································6 4、重复接地系统·············································6 5、现场施工总控制箱、分配电箱及及开关箱分布图··············6 六、避雷系统····················································6 七、确定防护措施················································6 八、制定安全用电措施和电气防火措施·······························6 九、临时用电安全管理制度········································15 十、现场施工用电及有关图表······································15 十一、临时用水················································18 一、工程概况 1、工程简介:湖南****体育新城住宅小区一期工程由长沙****置业有限公司开发。工程位于长沙市雨花区****村,****路交****路东南侧.其中2#标段由六栋高层建筑群,一栋商铺和地下车库组成.其中B1、B2、B5、B6、栋为11层住宅,A1、A2栋为18层住宅,商铺A为2层,由中建**局**公司承建施工.具有工程量大,工期紧迫等特点. 2、主要设备投入:由于该工程所具有的特点,投入的设备多,用电总功率比较大.因此,对整个工程现场用电应该实行统一管理,统一布设的用电控制措施。根据本工程具体情况及施工组织设计,拟将投入使用的设备主要有塔式起重机3台、输送泵2台、电焊机8台、对焊机1台以及其它施工用的小型设备若干。如:切断机、弯曲机、水泵、振动泵、木工机械等。设备的选择以及功率的大小详见后表第七章(总功率857KW)。为安全顺利地施工,对上述这些用电较大的设备采取分线路供电方法进行用电控制。 3、主要设备布置:根据现场施工要求,于拟建建筑物B-1#楼、B-5#楼之间设TC5013B塔式起重机一台;B—2#楼、B—6#楼之间设TC5610B塔式起重机一台;A-1#楼、A—2#楼之间设TC5013B塔式起重机一台;B—5#楼拟建一钢筋加工车间;一台砼输送泵分置于B—5#楼北面处;一台砼输送泵分置于A-2#楼北面处;用电平面布置图附后。 二、编制依据 依据中华人民共和国行业标准JGJ46—2005《施工现场临时用电安全技术规范》,公司的工程技术手册及有关的质量、环境、安全程序文件. 三、现场施工负荷计算 ∑P1为用电高峰期塔吊、搅拌机、砼输送泵、物料提升机、插入式振捣器、平板振动器、钢筋切断机、钢筋弯曲机、钢筋调直机、木工机械、高压泵功率之和;∑P2为用电高峰期电焊机,电渣压力焊、对焊机功率之和。 ∑P1=431.8KW∑P2=344KW∑P3=60KW∑P4=50KW P总=1。05×(K1∑P1/cosØ+K2∑P2+K3∑P3+K4∑P4) =1.05×[0.6×431.8/0。75+0.6×344+0。8×60+1.0×50] =682。332KVA 式中:P总—工地总用电量(KVA); P1—电动机额定功率(kW); P2—电焊机额定容量(kV