预览加载中,请您耐心等待几秒...
1/10
2/10
3/10
4/10
5/10
6/10
7/10
8/10
9/10
10/10

亲,该文档总共17页,到这已经超出免费预览范围,如果喜欢就直接下载吧~

如果您无法下载资料,请参考说明:

1、部分资料下载需要金币,请确保您的账户上有足够的金币

2、已购买过的文档,再次下载不重复扣费

3、资料包下载后请先用软件解压,在使用对应软件打开

Schneider(Beijing)MediumVoltageCo.,Ltd. 施耐德(北京)中压电器有限公司 INS-TC-027 Rev.A OKKEN低压成套开关设备宁德项目柜体现场安装指导 InstallationGuideforOKKENNDNuclearProject NAME DEPARTMENTSIGNATUREDATE DraftedbyOriginator/ReviserSuPeng CheckedbyDCCWangXin PMManagerZhouHaoying ReviewedbyLVdesignmanagerZhangHuairong ProjectLeaderLuoJie ApprovedbyQualityManagerLiJian NOTES:ThisdocumentisthepropertyofSBMV.Itmustnotbeusedreproduced,transmittedordisclosedbyanymeans withoutthepriorwrittenpermissionofSBMV.Printedcopiesofthisdocumentarenotcontrolled,unlessstampedinred"发 布受控". 注意:本文件所有权属于SBMV。未经事先的书面许可,不得以任何形式复制,传播或者外传该文件。未盖红色”发 布受控”章的复印版本为无效版本。 REV. VV A2010.05.05SuPengOriginalVersionDistributionto HR FIN DATEREVISORSECTIONREVISIONOFTHESCOPE EHS&SecurityGENTCSCMQAIND ContinuousImprovement BusinessSupport ProjectExecution OKKEN InstallationGuideforOKKENNDNuclearProjectInstallation TenderingDISTRIBUTION/DOCUMENTATION ProductManagement LVDesign低压成套开关设备宁德项目柜体现场安装指导 REVISIONHISTORY/REVISION MVDesign Planning Warehouse FlowManagement Transportation SupplierQuality 版本历史IQI CutomerComplaint QualitySystem 文件分发 ProcessQuality FinalQualityControl Localization purchasingINS-TC-027 LVProdutionRev.A MVProduction Page2of17Page2of Method Maintenance OKKEN低压成套开关设备宁德项目柜体现场安装指导INS-TC-027 InstallationGuideforOKKENNDNuclearProjectRev.A 目录/TableofContents 章节页码 1.0目的......................................................................4 2.0范围......................................................................4 3.0职责......................................................................4 4.0定义......................................................................4 5.0内容......................................................................4 5.1简介.....................................................................4 5.2接收.....................................................................4 5.3搬运.....................................................................5 5.4存放.............