预览加载中,请您耐心等待几秒...
1/10
2/10
3/10
4/10
5/10
6/10
7/10
8/10
9/10
10/10

亲,该文档总共79页,到这已经超出免费预览范围,如果喜欢就直接下载吧~

如果您无法下载资料,请参考说明:

1、部分资料下载需要金币,请确保您的账户上有足够的金币

2、已购买过的文档,再次下载不重复扣费

3、资料包下载后请先用软件解压,在使用对应软件打开

海南电网有限责任公司2015年单相电能表轮换项目施工招标技术文件招标编号:SG-2015-XX正本海南电网有限责任公司2015基建配网10千伏及低压项目-(XX局2015年农网改造升级工程10千伏及低压项目A标)施工招标投标文件技术文件投标人:XX电力建设有限公司(盖单位章)法定代表人或其委托代理人:(签字)2015年6月29日目录技术标前附表····························4施工组织设计纲要·························5(一)工程概况及特点··························51.1工程概况·····························51.2工程特点·····························5施工现场组织机构·························72.1组织机构关系图·························72.2工程主要负责人简介·······················8(三)施工方案······························113.1施工准备·····························113.2施工工序总体安排·······················143.3主要工序和特殊工序的施工方法················153.4工程成本的控制措施·······················30(四)工期及施工进度计划························324.1工期规划及要求·························324.2施工进度计划网络图······················324.3施工资源计划··························324.4施工进度计划分析························344.5计划控制程序··························35(五)质量目标、质量保证体系及技术组织措施············365.1质量目标·····························365.2质量管理组织机构及主要职责··················365.3质量管理的措施·························375.4质量管理及检验的标准·····················385.5质量保证技术措施························395.6深化WHS、施工作业指导书和验评标准的现场应用······415.7完善基建项目缺陷管理制度、表单所有项目均严格实行缺陷填报·······························47(六)安全目标、安全保证体系及技术组织措施············496.1安全管理目标···························496.2安全管理组织机构及主要职责··················496.3安全管理制度及办法·······················526.4安全组织技术措施·······················536.5重要施工方案和特殊工序的安全过程控制···········546.6持续推进基建安风体系认证工作严格执行“四步法”、“八步骤”、5S管理形成施工现场安全管理文化········566.7配合建设单位日常检查扣分工作················596.8实行全员持证上岗·······················596.9规范PPE管理··························596.10严格执行南网“五个严禁”··················62(七)工程分包的管理··························67(八)环境保护、水土保持及文明施工·················688.1环境保护·····························688.2加强施工管理、严格保护环境·················68