预览加载中,请您耐心等待几秒...
1/9
2/9
3/9
4/9
5/9
6/9
7/9
8/9
9/9

在线预览结束,喜欢就下载吧,查找使用更方便

如果您无法下载资料,请参考说明:

1、部分资料下载需要金币,请确保您的账户上有足够的金币

2、已购买过的文档,再次下载不重复扣费

3、资料包下载后请先用软件解压,在使用对应软件打开

XXXXXXXXX桩基子分部工程(监理评估小结编制(监理工程师):日期:审核(总监理工程师):日期:XXXXXX工程有限公司XXXXXXX工程项目监理机构(盖章)一、工程概况工程名称:XXXXXXXXXXXXX地点:XXXXXXXXXXXX基础类型:桩基(泥浆护壁钻孔灌注后压浆桩)建设单位:XXXXXXXXXXXXXXXXXXXXXXXXXXX勘察单位:XXXXXXXXXXXXXXXXXXXXXXXXXXXXX设计单位:XXXXXXXXXXXXXXXXXXXXXXXXXXXXX项管单位:XXXXXXXXXXXXXXXXXXXXXXXXXXXXX监理单位:XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX检测单位:XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX施工单位:XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX本工程体育场结构基础地基基础设计等级为甲级桩基设计等级为甲级采用泥浆护壁旋挖成孔灌注后压浆桩(桩径为800mm)桩端持力层为中风化泥质粉砂岩桩端进入持力层深度不小于3m。体育场验收XXX根本次验收区域体育场桩基工程XXXXXXX-XXXXXX日工程桩设计单桩竖向抗压承载力特征值为4300KN单桩水平承载力特征值为230KN。二、监理评估依据1.工程建设监理合同2.工程施工合同3.工程设计施工图4.《建筑工程施工质量验收统一标准》GB50300-20135.《工程测量规范》GB50026-20076.《建筑地基基础工程施工质量验收规范》GB50202-20137.《建筑桩基技术规程》JGJ94-20088.《建筑基桩检测检测技术规范》JGJ106-20149.《建筑地基基础技术规范》DB42/242-201410.《工程建设标准强制性条文》11.其余国家及地方有关的现行技术标准及图集等。12.其他相关文件三、工程施工监理情况桩基础子分部工程施工过程我部监理工程师依据《委托监理合同》、《监理规范》、《施工合同》、施工图纸等相关技术规程、规范实施监理工作坚持“施工讲规范、验收讲标准、管理讲程序”的原则严格按《监理规划》、《监理实施细则》及《旁站监理方案》进行施工质量的控制和验收。主要监理工作有:1、核查施工单位现场项目管理机构的质量管理体系及其组织机构是否正常运行“三检”制度及质量报验程序是否按规定执行。2、督促施工单位编制桩基施工专项施工方案并进行认真审查审查砼试块留置计划。3、测量放线的质量控制:项目部安排专人负责测量工作要求施工单位首先复核主控网点的坐标及标高将每个桩位的计算结果书面报监理公司审核检查无误后方可在现场测量放线在施工过程中跟踪复测已放好的桩位点避免施工过程中土体挤压造成桩位标志的移动确保桩位施打前的准确度4、原材料控制:首先我们要求施工单位制订了详细的原材料检验、试验计划同时我监理部根据施工内容编制了详细的见证取样监理实施细则。我方对每一个品种每一种规格每一批次的进场材料都进行严格的检查。在材料进场前首先检查材料的质保资料是否完整、有效品牌、数量是否与拟进场材料吻合检查合格后允许进场并集中堆放;对需要复试的材料或半成品严格按照规定进行取样、封样及送检未得到合格的检测报告以前不得使用;对检测不合格的材料要求施工单位将不合格材料限期退场我监理人员现场进行数量清点并旁站退场。对打桩的各道工序严格验收对持力层岩样勘察现场判断入岩留置岩样。5、检查施工前技术准备状况督促施工单位做好混凝土浇筑前的准备工作检查混凝土厂家提供的配合比依据旁站监理方案做好旁站监理;对进场的每车混凝土进行塌落度检测符合要求方可进场对混凝土的方量进行了过磅做好混凝土的计量工作对旁站过程发现的问题要求施工单位整改并做好旁站监理记录。6、强化过程控制对桩基的定位、成孔、清渣、钢筋笼制安、灌注混凝土等进行全过程检查对出现的钢筋笼焊接不饱满焊接长度不足垫块放置间距超出要求等质量问题及时指出并督促改正施工单位整改后进入下道工序并按旁站方案对桩基混凝土浇筑实施全过程跟班监督。7、做好桩基混凝土浇筑之前的沉渣测量工作对于沉渣厚度大于50mm要求施工单位做好二次清孔清孔到位后方可进行混凝土浇筑。8、每周召开监理例会形成例会纪要共7份对施工过程中存在的质量问题和安全隐