预览加载中,请您耐心等待几秒...
1/10
2/10
3/10
4/10
5/10
6/10
7/10
8/10
9/10
10/10

亲,该文档总共15页,到这已经超出免费预览范围,如果喜欢就直接下载吧~

如果您无法下载资料,请参考说明:

1、部分资料下载需要金币,请确保您的账户上有足够的金币

2、已购买过的文档,再次下载不重复扣费

3、资料包下载后请先用软件解压,在使用对应软件打开

十二院城A2楼施工升降机施工方案 第页共NUMPAGES15页 目录 TOC\o”1-2”\h\z\uHYPERLINK\l"_Toc82487643"1.编制依据··················································PAGEREF_Toc82487643\h2 HYPERLINK\l"_Toc82487644”2。分项工程概况··············································PAGEREF_Toc82487644\h2 HYPERLINK\l"_Toc82487645"3.基础设计荷载取值··········································PAGEREF_Toc82487645\h2 HYPERLINK\l”_Toc82487646"4。基础施工要求··············································PAGEREF_Toc82487646\h3 HYPERLINK\l”_Toc82487647"5。安装安全要求··············································PAGEREF_Toc82487647\h3 HYPERLINK\l”_Toc82487648"6.安装前的准备工作········································PAGEREF_Toc82487648\h4 HYPERLINK\l"_Toc82487649”7.升降机的安装··············································PAGEREF_Toc82487649\h4 HYPERLINK\l"_Toc82487664"8。平台脚手架、结构加固······································5 HYPERLINK\l"_Toc82487664”9.安装及安全使用········································8 HYPERLINK\l"_Toc82487665”10.升降机的拆除···········································8 HYPERLINK\l”_Toc82487665"11。应急预案·················································9 HYPERLINK\l"_Toc82487666"12.验收····················································9 HYPERLINK\l”_Toc82487667”13。附图····················································10  1.编制依据 1.1十二院城一期工程施工组织总设计 1。2十二院城一期工程施工图纸 1.3建筑地基基础工程施工质量验收规范GB50202-2002 1.4建筑机械使用安全技术规程JGJ33—2001 1。5SC系列施工升降机安装说明书 2.分项工程概况 十二院城一期工程A1栋高层住宅工程,结构形式为剪力墙结构,抗震等级一级,设防烈度8度,主体34层,建筑物总高度98.6m. 主体结构及装修阶段施工时,垂直运输机械采用SCD200/200施工升降机一台配合施工,计划安装时间为结构14层开始.根据施工现场的场地情况及建筑物的平面位置,确定施工升降机安装于建筑物南侧3~5轴之间,中心距A轴4500mm,升降机安装高度为106。5m(-1。600~98.6m,计71节标准节)。基础平面尺寸为3600×4500mm,在地下二层顶板上做300mm厚C30混凝土基础,基础四周砌240厚砌体高400mm。顶板压力达到30mpa的要求。 由于升降机基础位于地下二层结构顶板上,并有沉降后浇带从基础中通过,该部位沉降后浇带提前浇筑混凝土,根据荷载要求对升降机及进料平台采用φ48*3。5钢管进行加固,不考虑结构板受力. 3.基础设计荷载取值 施工升降机自重:安全系数K=2。1,SCD200/200型施工升降机按高度106.5m时的重量:P1=(吊笼重+外笼重+导轨架总重+对重重+载重量)×2.1。吊笼重32KN,外笼重16KN,导轨架总重=(每节重1.61KN,每节高1。508m)1.61KN×71节=114.31KN,载重40KN,对重32KN。P1=(32