预览加载中,请您耐心等待几秒...
1/3
2/3
3/3

在线预览结束,喜欢就下载吧,查找使用更方便

如果您无法下载资料,请参考说明:

1、部分资料下载需要金币,请确保您的账户上有足够的金币

2、已购买过的文档,再次下载不重复扣费

3、资料包下载后请先用软件解压,在使用对应软件打开

复杂地质条件下地铁盾构施工要点分析 Abstract Withthedevelopmentofurbanization,theconstructionofsubwayshasbecomeanimportantmeansoftransportation.However,complexgeologicalconditionsoftenleadtodifficultiesinsubwayshieldconstruction.Therefore,thispaperanalyzesthekeypointsofsubwayshieldconstructionundercomplexgeologicalconditions,aimingtoprovidereferencefortheconstructionofsubwayshieldinpracticalengineering. 1.Introduction Undercomplexgeologicalconditionssuchasfaults,water,softsoil,karst,andhighgroundwaterlevel,subwayshieldconstructionfacesvariouschallenges.Thispaperwillanalyzethekeypointsofsubwayshieldconstructioninthesecomplicatedgeologicalconditions. 2.TheKeyPointsofSubwayShieldConstructionunderDifferentGeologicalConditions 2.1Faultzone Faultzonesaregeologicalstructurespronetoinstabilityanddeformation,whichposeasignificantchallengetotheconstructionofsubwayshields.Whencrossingafaultzone,itisnecessarytoconsiderthedeformationanddisplacementoftheshield,thesealingofthetunnel,andtheprotectionofthesurroundingenvironment.Thekeypointsofsubwayshieldconstructioninafaultzoneareasfollows: (1)Real-timemonitoring:Real-timemonitoringmustbecarriedoutduringthewholeconstructionprocesstodetectthedeformationanddisplacementoftheshieldinatimelymanner,soastotimelyadjusttheconstructionplan. (2)Groundwatercontrol:Groundwatercontrolmeasuresshouldbetakentoreducethewaterpressureandpreventwatererosion,whichiscausedbyseepageinthefaultzone. (3)Shieldsealing:Itisnecessarytoensurethetightnessoftheshieldsoastoavoidsoilandwaterinflow. 2.2Water-richgeologicalconditions Highgroundwaterlevelandwater-richgeologicalconditionscanposeasignificantchallengetosubwayshieldconstruction.Thekeypointsofsubwayshieldconstructioninwater-richgeologicalconditionsareasfollows: (1)Groundwaterdrainage:Measuresshouldbetakentoreducegroundwaterinfiltration,suchaspumpingwells,grouting,anddrainage. (2)Controlofwaterinflow:Sealingmeasuresshouldbetakentopreventwaterinflow.Forexample,animperviouslayercanbesetupatthebottomofthetunnel,andawater-proofcoa